PDF File
AC CONDENSER GUARDS:
-
Manufacturer:
All Weather Steel Products Salt Lake City Utah
Model Air Guard 200 or approved equal
(All substitution must be approved at least 10 days prior to bid date.)
-
Master Frame:
-
Master frame constructed of 16 gauge 1.00 x 1.00 G90
galvanized tubing. 16 gauge steel galvanized angle is also welded to the
master frame, providing a secure stop for attachment of the expanded metal.
This addition is made prior to cutting, at no less than 6” centers.
-
Members are then welded into a 4-sided configuration to
create (1) front panel (2) side panels (1) top panel and (1) swinging rear
panel.
-
Each 4-sided panel is then ground at all existing corners
to improve appearance.
-
Expanded Metal:
-
Hot dipped #14 x 1/2 galvanized flattened expanded
metal.
-
Insert in master frame assembly attach with spot
welds at 5” centers (no exposed welds allowed).
-
Mullion:
-
1 x 2.5 16 gauge galvanized steel. This shall be
bent at two 90 degrees angles to create a C section.
-
Mullion is then welded at each end of the guards top,
side, and vertical members. Additional mullion is to be added to the top
panel when guard depth exceeds 54”.
-
Hardware:
-
(2) Padlock receiving shoes are inserted into the pad
at the guards lower rear bottom intersection. These shoes have a
preformed tab with a hole to receive padlock and also a pre-drilled hole
at the shoes base to receive a fastener as a result being attached to
the pad. (All (6) concrete fasteners and (2) padlocks to be provided by
the contractor). Shoes are formed from 14 gauge galvanized steel sheet.
-
(2) 3/16” steel formed pivots are created to form one
shape, which include a base of no less than 4 1/2” long. Pre-drilled
base pivots to receive (2) fasteners for anchoring to pad. The vertical
side section of pivot to include a 1/2 x 2” long round steel shaft which
inserts into pre-drilled holes at the guards front lower member.
-
(6) Fasteners 5/16 x 3/4 hex nut and bolt are
furnished to assemble top, sides and front panels forming a 5-sided
rectangular assembled unit.
-
Finish:
-
All galvanized parts are then treated with a high
pressure phosphate treatment. The prepared surface is then powder
coated and baked at a temperature of 450 degrees for a minimum of 20
minutes. This baked powder coating provides long lasting protection
from rust and the effects of weather.
-
Quick Bolt Assembly:
-
1” x 1 1/2” x 14 ga. Steel tabs are welded to each
panel. This allows the front, top and side panels to be bolted together
at each corner with 3/4 x 5/16 hex bolts and nuts. This six bolt mount
creates a very rigid construction while allowing for quick assembly and
disassembly. There are no exposed fasteners on the exterior of the
condenser guards.
|
|
|
|
|
|
|
|
|
|